wayside ministries project

our work: tight quarters demolition

TWO THREE-STORY BUILDINGS HAD TO BE REMOVED ON A TIGHT SITE FOR A NEW BUIlding

The Wayside Ministry demolition project was completed in phases. The first building was demolished for the new building while the second building was utilized. After the new building was built, the 2nd building was removed in between the new building and another building. Work was performed safely and efficiently.

From Our Clients

We love the work we've accomplished with our clients! Here's what some have to say about their experience with Alpine.

Work With Alpine

Demolition Details

Our Latest Resources

Keep up with Alpine Demolition's current thoughts, stories, and reports in the industry.

View More Resources
A large building is being demolished by a yellow excavator.
02 Apr, 2024
Breaking Ground: Exploring 4 Methods of Building Demolition. From Implosion to Deconstruction, Learn the Techniques Behind the Process.
a yellow excavator performing a commercial demolition project.
27 Feb, 2024
Plan your next commercial demolition with confidence. Explore expert insights on estimating costs for a successful and budget-friendly project.
a yellow excavator is digging a hole in the ground, with a different excavator bucket type
15 Feb, 2024
The excavator is hands down one of the most popular pieces of equipment used in construction and demolition today. These heavy-duty vehicles are versatile - able to dig, lift, and carry.

Professional Associations

Let's Get Your Project Started

Alpine Demolition is a full service demolition contractor. We demolish buildings, infrastructure, railroads, interior, and provide specialty demolitions. 

Interested in our services? Fill out our contact form or call 630.761.0700.

Wayside Ministries Project Contact Form

Share by: