Ozinga South Torrence
Tight time frames also have to be met on these projects and attention has to be taken not to damage existing items to remain.
Read MoreWayside Ministries – Tight Quarters Demolition
The first building was demolished for the new building while the second building was utilized.
Read More1600 N Milwaukee
As part of the work, the roof of a five-story building was removed saving the adjacent brick walls.
Read MoreCTA Washington Wabash
Pedestrians, noise, and train traffic had to be taken into consideration for the project.